Pleasantdale Elementary School

DeKalb County School District
12022.07

This project consists of a new Prototype Elementary School constructed on the existing Pleasantdale ES site located at 3695 Northlake Drive in Doraville. The new building includes 58 Instructional Units, Media Center, Cafetorium and Kitchen, Gymnasium, and administration areas. Site work to accommodate the new school building, bus parking, car parking, play field and playgrounds, along with demolition of the existing building and existing site improvements is also included in the scope of this project.

Released for Proposals - November 9, 2017

Mandatory Pre-Proposal Conference - November 28, 2017 at 10AM

Proposal Due Date - January 11, 2018 at 2PM   Proposal Due Date revised by Addendum 5 to be Tuesday, January 16, 2018 at 2 PM.

Please visit DeKalb County School District's Solicitations Web Site for RFP.

www.dekalbschoolsga.org/solicitations/ 

Riverwood High School 3rd Floor Build-out

Fulton County Schools
16015.01

This project consists of an interior build-out of the unfinished 3rd floor of the new Classroom Building at Riverwood High School.

Issued for Proposals: Wednesday, October 25, 2017

Pre-Proposal Conference: Monday, November 6, 2017 at 11 AM at Riverwood High School

Proposal Due Date: Tuesday, November 28, 2017 at 2:30 PM local time.

Fulton County Schools has awarded this project to R.K. Redding Construction, Inc. of Bremen, GA.

 

DOWNLOADABLE FILES
Specification Table of Contents
Addendum No. 1
Addendum No. 2
Register of Bid Documents

Walton High School - Stage 2, Phase 2 - Performing Arts and Athletic Spaces

Cobb County School District
17005

This project consists of an addition to the recently completed Stage 1 Replacement School for Walton High School at 1590 Bill Murdock Road in Marietta. The 151,000 SF addition contains the Performing Arts and Athletics components of the new school and the addition contains a Theater, a Black Box Theater, Band, Orchestra and Choral Suites, a Main Gymnasium, an Auxiliary Gymnasium, a Wrestling Room, a Weight Room and a Sports Medicine Suite.  Other items of work include demolition of existing Athletics and Performing Arts buildings, construction of a free-standing Maintenance Building, ADA improvements to the existing Baseball Field, new access to the existing Football Field Press Box, new emergency lighting at the Football Stadium, new track surfacing at the existing Football Field and a new entrance to the Football Field. 

Issued for Proposals: Tuesday, December 19, 2017

Pre-Proposal Conference: Wednesday, January 10, 2018, 10:00 AM

Proposal Due Date: Wednesday, February 14, 2018, 3:00 PM

 

DOWNLOADABLE FILES
Specification Table of Contents
Request for Proposals
Instructions to Offerors
Register of Bid Documents

Riverwood High School Replacement Project

Fulton County Schools 403-18
16015

This proposal request consists of Construction Manager at Risk services for the Riverwood High School Replacement project. 50% Construction Documents for the first phase of this project, Phase 2B - Cafeteria/ Media Center Addition, are included in the proposal request for estimation purposes.  

Issued for Proposals: December 11, 2017

Pre-Proposal Conference: Friday, December 15, 2017  at 9 AM at Riverwood High School

Proposal Due Date: Thursday, January 11, 2018 at 2:30 PM local time.

 

 

Osborne High School Rebuild

Cobb County School District
16005

This project consists of an addition to the existing Osborne High School at 2415 Favor Road, Marietta, GA 30060. The 292,539 SF addition contains Classroom, Main Competition Gymnasium, and Administration Components. The project is to be constructed in multiple stages so that the existing school may remain operational. Preliminarily, Cobb County School District is providing temporary modular classrooms to replace the classrooms in the existing classroom (5010) and auxiliary gymnasium (5020) buildings. This work is to be completed under a separate contract in Spring 2018. Stage 1A of these documents includes the enabling work required to make the campus functional during the Stage 1B construction. Stage 1A (Summer 2018) consists of site work required for access to the temporary modular classrooms, construction of a temporary attendance/ guidance office, modifications to Building 5110 to add a Business Ed Lab, site modifications for bus and car access, and utility/ systems modifications required to keep remaining buildings functional. Stage 1B includes the demolition of the existing classroom (5010) and auxiliary gymnasium (5020) buildings; construction of the new classroom building designed to house Administration, General and Science Classrooms, and CTAE; construction of a separate Automotive Technology and Construction Technology wing; and modifications to the student drop-off/ visitor parking area at the Favor Road entrance. Stage 1C (Summer 2019) includes partial renovation of the existing Media Center and construction of a temporary wall; and ADA upgrades to the existing Baseball Field Facilities/ site area. Stage 1D (Summer 2020) involves additional renovations to the existing Media Center, including removal of temporary wall; modifications and finish material replacement in Building 5110; painting of all existing buildings to remain. The final stage of work, Stage 2, includes the demolition of the existing Science Classroom Building (5031) and the CTAE Building (5041); then construction of a new Competition Gymnasium. 

Issued for Proposals: Wednesday, February 14, 2018

Pre-Proposal Conference: Thursday, February 22, 2018, 10:00 AM

Proposal Due Date: Thursday, March 15, 2018, 3:00 PM